California Water Service awards design-build contract to Covenant Technical Solutions for tank mixing and dosing upgrade

Project to improve water quality at five Southern California sites

(Image: Convenant Technical Solutions (CTS))

California Water Service (Cal Water) has awarded Covenant Technical Solutions (CTS) a multi-million-dollar design-build contract to enhance water quality through upgraded tank mixing and chemical dosing systems across five potable water storage tank sites in Southern California. The project aims to improve disinfection performance and water reliability for thousands of customers.

Each site will be equipped with chemical storage and metering systems to administer sodium hypochlorite and ammonium sulfate. These substances are used to eliminate harmful pathogens and maintain disinfectant stability while minimising chlorine-related taste and odour.

“We’re proud to put our decades of experience to work for California Water Service and the communities they serve,” said Rob Craw, chief executive officer and founder of CTS. “This project reflects our commitment to protecting water quality and serving the people who rely on it.”

The project team includes Pacific Advanced Civil Engineering (PACE), which is contributing water treatment design expertise, and Geo-Advantec, Inc., providing geotechnical engineering. According to Jacob Peterson, vice-president of PACE’s Environmental Water Division, “We’ve formed an integrated relationship with CTS that ensures excellence across all project phases – from conceptual design through construction and operation.”

Each tank will be fitted with submersible mixers to ensure uniform chemical and temperature distribution, along with continuous monitoring systems to track chloramine concentrations. Real-time controls will automatically adjust chemical dosing if disinfectant levels fall below specified setpoints.

“Maintaining water quality and protecting public health is always our top priority,” said Evan Tuliglowski, assistant engineer of capital delivery at Cal Water. “We selected CTS because we need a partner with the technical depth to manage complex water quality issues and the practical experience to deliver efficient construction. Their strong reputation across California gives us confidence in the success of this project.”

Construction is expected to begin in Mar 2025 and conclude by Jun 2026.